Seq.#
|
Data Element Identification
|
Data Element Description
|
Notes/ Comments
|
|
1
|
Operation Phase
|
Enter the operation (or test)
phase
|
e.g. Flight, Test, Operational
Deployment.
|
|
2
|
Fault Symptom(s)
|
Summary of the fault (one
liner)
|
e.g. Loss of
Transmitter
|
|
3
|
Date
|
Date of the fault occurrence
|
|
|
4
|
Log No.:
|
Enter a sequential Log
Number
|
This may be allocated
automatically by a database utility
|
|
5
|
WRA Reference
Designator
|
Enter the WRA reference
designator/ part number.
|
If a WRA is removed due to
failure.
|
|
6
|
WRA: Nomenclature
|
Enter the WRA
nomenclature
|
If a WRA is removed due to
failure.
|
|
7
|
WRA Serial Number
|
Enter the WRA serial
number
|
If a WRA is removed due to
failure
|
|
8
|
WRA Cum. Op Hours
|
Enter the WRAs cumulative
operating hours
|
If a WRA is removed due to
failure
|
|
9
|
SRA Reference
Designator
|
Enter the SRA reference
designator/ part number.
|
If a SRA is removed due to
failure.
If a WRA is returned to the
subcontractor and vendor failures reports will
supplement the information in this
field.
|
|
10
|
SRA:
Nomenclature
|
Enter the SRA
nomenclature
|
If a SRA is removed due to
failure.
If a WRA is returned to the
subcontractor and vendor failures reports will
supplement the information in this
field.
|
|
11
|
SRA Serial Number
|
Enter the SRA serial
number
|
If a SRA is removed due to
failure.
If a WRA is returned to the
subcontractor and vendor failures reports will
supplement the information in this
field.
|
|
12
|
Description of Failure
Effects
|
Enter a detailed description for
the failure effects on the operation of the
System
|
|
|
13
|
Description of Failure
Cause
|
Enter a detailed description of
the Failure Cause. Detail to be entered is to
commensurate to the level of the unit replacement.
e.g. System, WRA, SRA
|
In addition to the collected
field data the subcontractor and vendor failures
reports will supplement the information in this
field.
|
|
14
|
Fault detection/ isolation
"On-Equipment"
|
Enter detailed information on
for the "On-Equipment" fault detection isolation
activities
|
Provide details on BIT, use of
support equipment etc. that was used to aid the
fault detect/ isolate task. To the WRA and/ or SRA
level
|
|
15
|
Maintainers
Provisions
"On-Equipment"
|
Comment on the maintainers
provisions
|
Provide details such as
accessibility, handling and tools used.
|
|
16
|
Name
"On-Equipment"
|
Enter the name of the person(s)
who completed the maintenance task
|
|
|
17
|
Task time
"On-Equipment"
|
Enter the task time that was
required to fault isolate and rectify the System
failure
|
|
|
18
|
Maintainer Improvements/
recommendations
|
Enter observed potential
problems areas associated to the maintenance
characteristics.
|
e.g. WRA was difficult to remove
from its operational position due
to.....or, the BIT was
ineffective and the use of additional SE for
diagnostics was required
|
|
19
|
Fault detection/
isolation
"Off-Equipment"
|
Enter detailed information on
for the "on-aircraft" fault detection isolation
activities
|
Provide details on BIT, use of
support equipment etc. that was used to aid in the
fault detect/ isolate task. To the SRA level, as
the WRA would of been removed from its operational
position
|
|
20
|
Maintainers
Provisions
"Off-Equipment"
|
Comment on the maintainers
provisions
|
Provide details such as
accessibility, handling and tools used.
If required, as the
remove unit (WRA/ SRA) may be directly returned to
the subcontractor, vendor or Customer
|
|
21
|
Name
"Off-Equipment"
|
Enter the name of the person(s)
who completed the maintenance task
|
If required, as the
remove unit (WRA/ SRA) may be directly returned to
the subcontractor, vendor or Customer
|
|
22
|
MTTR
"Off-Equipment"
|
Enter the task time that was
required to fault isolate and rectify the System
failure
|
If required, as the
remove unit (WRA/ SRA) may be directly returned to
the subcontractor, vendor or Customer
|
|
23
|
Fault detection/ isolation
"Off-Equipment"
|
Enter detailed information on
for the "On-Equipment" fault detection isolation
activities
|
Provide details on BIT, use of
support equipment etc. that was used to aid in the
fault detect/ isolate task
|
|
24
|
Maintainer Improvements/
recommendations
|
Enter any observed potential
problems areas associated to the maintenance
characteristics.
|
e.g. SRA was difficult to remove
from its operational position due to... or, the
BIT/ test points were ineffective and the use of
additional SE for diagnostics was
required
|
|
25
|
Disposition
|
Enter the disposition of the
analysis activity as performed by the R&M
Engineer. This will include No Action, Observation,
Corrective Action
|
The Reliability Engineer will
enter the disposition information.
|
|
26
|
Date
|
Enter the date for the close-out
of the Failure Report.
|
|
|
27
|
Names
|
Enter the names for the key
personnel involved in the disposition of the FR.
|
This includes the Reliability
Engineer, Reliability Engineering Manager, and the
Program Manager (In the event of a CA been
Raised)
|
|
28
|
CA No.:
|
Enter the corrective action
number
|
This is a sequential tracking
assigned to each Corrective Action
Raised.
|