Note
|
Failure
Report Action
|
Key
Points
|
|
1
|
Raise initial failure
report
|
Test Phase; Operation
Phase, Fault Symptoms; Date of Occurrence; Log
number: Detailed description of Failure
effects
|
|
2
|
Complete "On Equipment"
Data
|
- For WRA and/ or SRA: Part
number; Nomenclature; Serial Number; Elapse Time
Meter reading (if available);
- Summarize the
maintainability process
- Summarize the adequacy of
maintainability provisions
- Record any improvements or
recommendations for the maintainer and possible
maintainability characteristics.
|
|
2a
|
Complete "On Equipment
Maintenance" Data
|
- For system level h/w
failures (other than WRA/ SRA) enter details of
repair action
- Summarize the
maintainability process
- Summarize the adequacy of
maintainability provisions
- Record any improvements or
recommendations for the maintainer
|
|
3
|
Complete "Off Equipment
Maintenance" Data
|
- For SRA: Part number;
Nomenclature; Serial Number;
- Summarize the
maintainability process
- Summarize the adequacy of
maintainability provisions
- Record any improvements or
recommendations for the maintainer and possible
maintainability characteristics
|
|
4
|
Annotate Close Out
Action
|
Annotate the Close Out Action
with the disposition stating the cause of the
system/ test failure. (other than a hardware
failure e.g. operator error, test procedure error
etc.). Include date.
|
|
5
|
Annotate Close Out
Action
|
Annotate the Close Out Action
with the disposition stating that the "Failed Unit
(WRA or SRA) has been return to Customer for
repair". Include date.
|
|
6
|
Summarize Vendors Failure
Report
|
Review the vendors failure
report, include a summary of the failure cause into
the original failure report. This will include the
identification of failed component(s) with circuit
designator numbers etc.
|
|
7
|
Close Out
Action
|
Summarize in the Close Out
Action, the disposition taken to resolve an
unwarranted failure trend/ problem e.g. the
corrective action.
|
|
8
|
Close Out
Action
|
Summarize in the Close Out
Action, the disposition taken to resolve an
unwarranted failure trend/ problem e.g. the
corrective action.
|
|
9
|
Annotate
Waiting
|
Annotate the Failure Report that
the vendor will supply a detailed failure report
and is required prior to closing out the Original
Failure Report
|